On June 27 we met with our project manager, for our “Pre-Drywall Meeting”. Basically, just to go over where all of the electrical and plumbing was installed, to make sure everything is where we wanted it to be. A few days before, we met with the home security company, who will be installing our security system and SURROUND SOUND SYSTEM in the living room. I’m a little excited about that.

We are only about 5-6 weeks from completion at this point.

Next stop, drywall!

Interior wth Stairs 0615
Come on in!
Family Room_Small
Family room, with fireplace

Upstairs Guest Bath_Small

Upstairs guest bathroom
Stairs to Second Floor_Small
Stairs to the second floor
Morning Room Slider Door_Small
Morning Room (dining room) with view of eventual back yard
Master Bedroom_Small
Master bedroom, with a peek into the master bathroom
Master Bedroom Walkin closet_Small
This is going to be our walk-in closet – almost as large as the other bedrooms!
Master Bedroom Broken Window_Small
Oops! We already have a broken window in the bedroom.
Master Bathroom Jacuzzi_Small
Bob’s Jacuzzi tub, in the Master Bath. He will probably never leave this room.
Master Bath Shower_Small
The shower in the Master Bath
Living Room_Small
The front living room
Kitchen View to Garage_Small
The view from the kitchen to the garage
Kitchen Vent_Small
Kitchen stove vent. I’m sure you all find this photo RIVETING
Kitchen Morning Room_Small
The kitchen and morning room (dining room)
Kitchen Ceiling Recessed Lights_Small
Recessed lighting in the kitchen
Garage_Small
The garage drain. Pure excitement.